Midnight Sun mining identifies expanded copper system at Dumbwa
Drilling at the Dumbwa deposit has identified a significant expansion of the mineralized system in the Northern Block, with copper mineralization exceeding 2,400 metres in width.

Midnight Sun Mining Corp. has reported that ongoing drilling at its Dumbwa copper deposit in Zambia has identified a significant expansion of the mineralized system in the Northern Block. Recent drilling encountered near-surface copper mineralization across an east-west extent exceeding 2,400 metres, which is more than double the average width of the previously drilled Dumbwa Mineralized Corridor.
The company has received results from 76 drill holes representing 17,373 metres of drilling. Highlights include intercepts of 31 m @ 0.47% Cu, 11 m @ 0.67% Cu, 7 m @ 1.05% Cu, and 14 m @ 0.48% Cu.
Dr. Kevin Bonel, Midnight Sun’s COO, stated that as drilling progresses north, the company appears to have passed through another structural disruption and is now encountering copper sulphide mineralization across significantly greater east-west widths. These observations are providing insight into the geological architecture of the Northern Block.
The Phase 1 drill program, which consisted of 372 diamond drill holes totalling over 87,000 metres, has demonstrated copper sulphide mineralization along more than 12 km of the Dumbwa Mineralized Corridor. This corridor comprises the southern portion of the broader 20 km Dumbwa Target.
The company has experienced extended assay turnaround times due to increased regional sample volumes, power interruptions, and equipment failures at Intertek's Kitwe preparation facility in Zambia. Intertek has implemented measures to address these delays, including transferring samples to its Johannesburg facility and prioritizing outstanding samples for analysis in Perth, Australia.
Approximately 5,000 samples, representing 70 drill holes, remain outstanding. Intertek has committed to equipment upgrades at its Kitwe facility, including replacement pulverising mills and an additional crusher, with commissioning targeted for December 1, 2026.
Key facts
- Drilling has identified copper mineralization across an east-west extent exceeding 2,400 metres.
- The Phase 1 drill program demonstrated copper sulphide mineralization along more than 12 km of the Dumbwa Mineralized Corridor.
- Intertek is upgrading equipment at its Kitwe facility with commissioning targeted for December 1, 2026.
Three perspectives
Neutral
Midnight Sun Mining Corp. is reporting expanded copper mineralization at its Dumbwa deposit while managing assay delays at a regional facility.
Positive
The company's Phase 1 drill program has been an unqualified success in discovering the source of a copper-in-soil anomaly.
Negative
The company has faced extended assay turnaround times due to power interruptions and equipment failures at the Intertek facility in Kitwe.
Your week in news, every Wednesday
The biggest stories of the week for your edition, in your inbox every Wednesday morning, your time. Free, and you can unsubscribe at any time.