Ho Chi Minh City completes nipa palm-inspired pedestrian bridge

The 720-m bridge across the Saigon River connects Bach Dang Wharf to the Thu Thiem peninsula and is expected to open during the 2027 Lunar New Year holiday.

Ho Chi Minh City completes nipa palm-inspired pedestrian bridge
Photo: VnExpress International

The main span of a new 720-m pedestrian bridge across the Saigon River was successfully joined on Oct. 21 after more than a year of construction. The bridge connects Bach Dang Wharf in the city center with the Thu Thiem peninsula. It is expected to open to the public during the 2027 Lunar New Year holiday next February.

The nipa palm leaf motif is expressed through interconnected steel arches that form a three-dimensional roof structure.

Takashi Niwa, chief architect of the design proposal and representative of the Chodai–Takashi Niwa Architects and Chodai Kisojiban Vietnam consortium, said the concept emerged during a 2019 design competition. The architects wanted the bridge to capture what sets Ho Chi Minh City apart from other tropical metropolises like Singapore and Bangkok.

The layout provides a navigation channel 80 m wide with 10 m of vertical clearance. This design minimizes the number of piers in the river, placing the main supports near the riverbanks. The city's selection council praised the layout for widening the navigation channel, reducing the risk of vessel collisions, and keeping the deck open for broader pedestrian views.

The project carries a total investment of nearly VND1 trillion (US$39.5 million) and is funded by food company NutiFood. Construction began in March 2025. The main span was fabricated and assembled at a factory in Vung Tau before being towed via a sea route.

Key facts

  • The 720-m bridge connects Bach Dang Wharf with the Thu Thiem peninsula.
  • The project cost nearly VND1 trillion (US$39.5 million) and was funded by NutiFood.
  • The bridge is expected to open during the 2027 Lunar New Year holiday.

Three perspectives

Neutral

The 720-m pedestrian bridge across the Saigon River connects Bach Dang Wharf to the Thu Thiem peninsula.

Positive

The city's selection council praised the layout for widening the navigation channel and reducing the risk of vessel collisions.

Negative

The project required a total investment of nearly VND1 trillion (US$39.5 million).

Your week in news, every Wednesday

The biggest stories of the week for your edition, in your inbox every Wednesday morning, your time. Free, and you can unsubscribe at any time.

Choose your news coverage

Please choose and confirm your coverage.

All sections

Edition