TMK Energy sets monthly gas production record at Gurvantes XXXV

Average daily gas output rose 11 per cent in October as regulators accept the company's gas discovery declaration.

TMK Energy sets monthly gas production record at Gurvantes XXXV
Photo: The West Australian

TMK Energy has reached a monthly gas production record at the Gurvantes XXXV project in Mongolia. Average daily gas production for October rose 11 per cent to 971 cubic metres per day (m³/day) from 872m³/day in September.

The October record of 34,300 standard cubic feet per day was achieved without contribution from new wells. Field uptime remained high despite brief power cuts, and water production held steady at 410 barrels daily.

At the seven-well Lucky Fox pilot in the Nariin Sukhait coal district, TMK is pumping water from coal seams to lower reservoir pressure and coax trapped methane into flowing through desorption. Management views rising gas rates against steady water output as a sign the reservoir strategy is working.

The company is starting a drilling and well enhancement campaign to move the project toward commerciality. A drilling rig and workover rig are on site. Rather than drilling many new wells, the company is using a lower-cost re-completion program to increase gas from existing producers.

The 2026 Work Program is underway, including the cleanout of idle well LF-03. The company plans to spud the Lucky Fox-08 (LF-08) well, with production expected by mid-December. TMK also plans to temporarily shut in LF-02 for a pressure build-up test during nearby drilling.

Regulators have accepted the gas discovery declaration, which paves the way to a 30-year production licence. TMK has 90 days to agree an appraisal program with Mongolia’s Mineral Resources and Petroleum Authority to allow for extended production testing. The results will support a field development plan and an exploitation licence.

Key facts

  • October gas production averaged 971 cubic metres per day.
  • Gurvantes XXXV has an independently certified 2C contingent resource of 1.2 trillion cubic feet of gas.
  • The Lucky Fox pilot is located in the Nariin Sukhait coal district.

Three perspectives

Neutral

TMK Energy is conducting a drilling and well enhancement campaign at the Gurvantes XXXV project.

Positive

The acceptance of the gas discovery declaration by regulators paves the way to a 30-year production licence.

Negative

The company's plan to shut in LF-02 for testing could reduce November production figures.

Your week in news, every Wednesday

The biggest stories of the week for your edition, in your inbox every Wednesday morning, your time. Free, and you can unsubscribe at any time.

Choose your news coverage

Please choose and confirm your coverage.

All sections

Edition