New research shows that wholesale price increases drive most of the cost impact on residential customers.

Large data center projects could increase residential electricity costs. In one model for Texas, costs rose by 1.64 cents/kWh. Most of this increase comes from wholesale electricity prices.

For many years, digital service growth did not increase electricity demand much. This happened because hardware and cooling became more efficient. Now, intensive computing workloads are changing this pattern.

Researchers looked at 371 announced data center projects in Texas. These projects total 38.9 GW by 2030. The study linked power system expansion and wholesale markets to residential costs.

The study found that 68% of the cost increase comes from higher wholesale electricity prices. Another 32% comes from regulated transmission charges. These are the costs for moving power through the grid.

Building new gas generation near data centers helps lower costs. In this scenario, the residential cost increase drops to 0.92 cents/kWh. However, excluding data centers from sharing transmission costs raises the increase to 1.87 cents/kWh.

The location of these centers matters for the grid. Adding 5 GW of demand in some areas leaves much more unserved energy than in others. For example, it leaves 5.6 TWh unserved in Abilene.

Wholesale electricity prices are the costs for buying power in the bulk market. Transmission charges are regulated fees for the physical network. Load refers to the amount of electricity being used.

The results show that the cost burden depends on where plants are built. It also depends on how infrastructure is planned and how costs are shared.

Key facts

  • Data center projects totaling 38.9 GW by 2030 could increase Texas residential electricity costs by 1.64 cents/kWh.
  • Wholesale electricity price increases account for 68% of the modeled residential cost rise.
  • Coordinated expansion of transmission and generation can reduce annualized investment by 73%.